Call us toll free: +86-21-58386189, 58386176

how much li ne to make ton cement

  • How Much Crushed Stone Do I Need for my Driveway?

    Make Use of a Materials Calculator. The best way to accurately figure out the amount of material needed is to make use of a materials calculator. This tool is simple and easy to use and will give you the best answer to the question "How much crushed stone do I need

    Get Price
  • How Much Crushed Stone Do I Need for my Driveway?

    Make Use of a Materials Calculator. The best way to accurately figure out the amount of material needed is to make use of a materials calculator. This tool is simple and easy to use and will give you the best answer to the question "How much crushed stone do I need

    Get Price
  • Lifting Sunken Concrete Driveway PadsYouTube

    Sep 29, 2018 · (1) remove and replace the sunken and cracked concrete pad for an estimated cost of $6,000 (I got three estimates), (2) lift the broken pads at a

    Get Price
  • Concrete Calculatorhow much concrete do you need in

    Free online concrete calculator for your construction projects. Calculate the required weight and volume of readymix concrete you need for your wall, column, steps, slabs, footings, and others. Easy to use calculator for how much concrete you need in cubic feet, cubic yards, cubic meters, tons, tonnes, as well as bags of concrete of different sizes.

    Get Price
  • Gravel Needed Calculator Gravel Calculator

    Let's be honestsometimes the best gravel needed calculator is the one that is easy to use and doesn't require us to even know what the gravel needed formula is in the first place! But if you want to know the exact formula for calculating gravel needed then please check out the "Formula" box above.

    Get Price
  • Hoover Dam Bureau of Reclamation

    How much does Hoover Dam weigh? More than 6,600,000 tons. What type of dam is Hoover? A concrete arch-gravity type, in which the water load is carried by both gravity action and horizontal arch action. What is the maximum water pressure at the base of the dam? 45,000 pounds per square foot. How much concrete is in the dam?

    Get Price
  • Concrete Forms and Pouring a Concrete Slab The Family

    Concrete pouring project overview and what you can save. How to make concrete forms and pouring a concrete slab foundation can be intimidating. Your heart races because you know that any mistake, even a little one, can quickly turn your slab into a big mess, a mistake literally cast in stone.

    Get Price
  • How Much Does A Gravel Driveway Or Road Cost?

    There are several different types of material you can make your gravel driveway with, so the cost per square foot can range from $0.40 to $2. The choices are typically priced by the cubic yard or per ton. Plain pea gravel and crushed clamshells are each priced at about $40 per cubic yard and $50 per ton.

    Get Price
  • Truck Mounted Line PumpsUsed Concrete Pumps

    Truck Mounted Line Pumps

    Get Price
  • How to Calculate a Concrete Pad Load Sciencing

    Knowing a concrete pad's thickness or depth is vital if you need to determine the load it can withstand. If the concrete pad is two-inches thick and the concrete manufacturer's stated compression strength is based on that thickness, then you can simply multiply the area by the stated psi to determine how much weight the pad can bear.

    Get Price
  • Truck Mounted Line PumpsUsed Concrete Pumps

    Truck Mounted Line Pumps

    How to Estimate Stone Walls Hunker

    Calculate the tonnage of gravel needed by converting the cubic foot volume into tons. Use the standard formula of 15 cubic feet of gravel = 1 ton of gravel. Divide the total cubic foot volume of gravel by 15 to determine the number of tons of gravel to purchase. For example, 80 cubic feet of gravel divided by 15 equals 5.333 tons.

    Get Price
  • Concrete calculator mix-on-site

    This calculator estimates the required amount of cement, sand and aggregate (stone) for mixing on site for a given area of concrete. Please note that this is based on a 1 2 4 ratio mix.

    Get Price
  • How to Mix Cement 11 Steps (with Pictures)wikiHow

    Mar 29, 2019 · To mix cement, start by combining 1 part cement, 2 parts sand, and 4 parts gravel in a large bucket or wheelbarrow. Next, make a small crater in this mixture and add half a bucket of water. Mix the cement with a shovel and add more water until it's formed a

    Views 511KGet Price
  • Portland Cement 1 ton (long) mass to cubic feet converter

    Conversion for how many cubic feet ( cu ftft3 ) of Portland cement are contained in a ton (long) ( 1 long tn ). Or, how much in cubic feet of Portland cement is in 1 ton (long)? To link to this Portland cement ton (long) to cubic feet online converter simply cut and paste the following.

    How to Build a Garage #1Layout and Concrete PiersYouTube

    Jul 06, 2018 · This is my best attempt to date to give as much information as possible while building a garage for a client, to help you build your own garage!! Follow along,

    Get Price
  • U.S. cement prices 2018 Statista

    This statistic represents the price of Portland and masonry cement in the United States 2007-2018. In 2018, the cement price came to around 127 U.S. dollars per metric ton.

    Get Price
  • Sand Calculatorhow much sand do you need in tons

    How much is a tonne of sand? A tonne of moderately damp sand typically fills about 0.625 m 3 (cubic meters). It can be more or less dense depending on water content and the size of the sand particles. Ton vs tonne, tons vs tonnes. When calculating the sand's weight, make sure you do not confuse the tonne (metric ton) with the ton (short ton).

    Get Price
  • How to Calculate the Load Bearing of Concrete Hunker

    Jul 12, 2017 · The only way to specifically calculate the load capacity of concrete is to have a licensed structural engineer process the formulas and consult a myriad of tables that all apply to the specific design of your project. You can, however, calculate the load capacity of concrete in

    Get Price
  • How to Estimate Stone Walls Hunker

    Calculate the tonnage of gravel needed by converting the cubic foot volume into tons. Use the standard formula of 15 cubic feet of gravel = 1 ton of gravel. Divide the total cubic foot volume of gravel by 15 to determine the number of tons of gravel to purchase. For example, 80 cubic feet of gravel divided by 15 equals 5.333 tons.

    Get Price
  • How to Calculate How Many Concrete Blocks are Needed for a

    Jul 17, 2017 · If you are planning to build a garage out of concrete block, you should know how many blocks you will need before you shop around at local block suppliers. Fortunately, a concrete block is standardized, with a face 8 inches high by 16 inches long, so you can use simple math to estimate the number of blocks your garage project will require.

    Get Price
  • Material CalculatorFred Burrows

    Step 2 Enter the length, width and depth of area to fill (NOTE depth is in inches, not feet) Step 3 Click Calculate to get amount needed

    Get Price
  • Concrete Calculator Volume Calculator Concrete2you

    Our concrete calculator allows you to accurately work out the amount of concrete you'll need for your project. Simply add the measurements for your concrete order to the relevant shapes above (you only have to fill in the shape/s you want to use) You can build up a concrete calculation for complicated areas by adding additional shapes of each type.

    Get Price
  • Concrete CalculatorHow Much Concrete Do I Need?The

    Quickly calculate concrete slab and footing pours by entering the depth, width and length to find the number of cubic yards or bags of concrete needed for your project. Give these calculations to your ready-mix supplier or use them to estimate how many 40, 60 or 80 lb. bags of concrete to buy.

    Get Price
  • How to Calculate How Many Concrete Blocks are Needed for a

    Jul 17, 2017 · If you are planning to build a garage out of concrete block, you should know how many blocks you will need before you shop around at local block suppliers. Fortunately, a concrete block is standardized, with a face 8 inches high by 16 inches long, so you can use simple math to estimate the number of blocks your garage project will require.

    Get Price
  • 2020 Concrete Curbing Cost Concrete Edging Prices

    Pre-Formed Concrete Block Prices. Much like brick, pre-formed concrete blocks are heavy, but easy to install if you're working with a relatively simple landscape. Furthermore, if the area you're curbing does not see a lot of foot traffic or water (from sprinklers) pre-formed blocks is the smart way to go.

    How to Build a Garage #1Layout and Concrete PiersYouTube

    Jul 06, 2018 · This is my best attempt to date to give as much information as possible while building a garage for a client, to help you build your own garage!! Follow along,

    Get Price
  • Mixing ConcretePractical DIY

    Mixing Concrete . The three main options for mixing concrete are Mixing by handthis is probably only suitable where less than about ¼m³ of concrete is required for a job providing that a reasonably fit person is available. Using a cement mixerthis is generally suitable where between about ¼m³ and 2m³ of concrete is required. It will require continuous mixing of loads and normally

    Get Price
  • Emissions from the Cement Industry

    May 09, 2012 · Cement manufacturing is highly energy- and emissions-intensive because of the extreme heat required to produce it. Producing a ton of cement requires 4.7 million BTU of energy, equivalent to about 400 pounds of coal, and generates nearly a ton of CO 2. Given its high emissions and critical importance to society, cement is an obvious place to

    Get Price
  • Cementmortar and concretemixes etc

    Cement in concrete and mortar creates its strength by chemical reaction, it is not like wallpaper glue which 'drys out', it 'goes off'. In fact, if the concrete or mortar should 'dry out' before the chemical reaction is substantially complete, it will fail. Likewise if it is subjected to a frost, it can also fail.

    Get Price
  • How much clinker is required to make one ton of cement

    Apr 30, 2017 · Your question is very complicated 1 Calculation of the amount of fly ash in clinker Assuming clinker heat consumption =780 kcal / kg of coal, coal air dry base calorific value of Qnet, ad=5900 kcal 8/ kg of coal, air dry base ash Aad=12% The amou

    What is typical clinker size for cement mill?May 08, 2019How much space is needed to store 5 cubic tons of cement Jun 08, 2018What is Clinker?QuoraNov 16, 2017How much coal is required to produce 1 MT of cement?May 22, 2016See more resultsGet Price
  • Coal & cement World Coal Association

    Coal & cement Varying the mix of cement, sand and aggregate enables concrete to be used in a range of applications. Products can be designed, coloured and shaped to accommodate a variety of environmental conditions, architectural requirements and to

    Get Price
  • Cement Production LineCHAENG

    In the cement production line, producing 1 ton of Cement need grind at least 3 tons of materials (including raw materials, fuel, clinker, mixed materials,gypsum).Grinding operation consumes about 60% of total power in cement plants, raw material grinding more than 30%, while coal mill used in cement plant consumes 3%, cement grinding about 40%.

    Get Price
  • Coal & cement World Coal Association

    Coal & cement Varying the mix of cement, sand and aggregate enables concrete to be used in a range of applications. Products can be designed, coloured and shaped to accommodate a variety of environmental conditions, architectural requirements and to

    Get Price
  • How to calculate cement aggregate and sand in KG by

    Mar 19, 2016 · To calculate proportion of cement, sand, coarse agrregate and water, It required to do mix design & for this initially it is required to know specific gravity of all items. For approx analysis, Detailed analysis on 1 2 4 (Ratio) As we know that du

    Get Price
  • How Many Bags of Cement Are in a Cubic Yard? Hunker

    Thus, a 3,600-pound cubic yard contains about 800 pounds of cement, which comes out to 10 of the 80-pound bags of cement or 13.3 of the 60-pound bags. Pure cement, sand and crushed rock all have about the same density, so a block of pure cement measuring 1 cubic yard of volume (about 3,600 pounds) will contain 45 bags of cement.

    Get Price

Related Posts